Essential details
Shipping:Ocean freight
Product Introduction
Transparent waterproof rubber kitchen and bathroom product manual
I. Product overview
The transparent waterproof adhesive is a waterproof material composed of high molecular polymer emulsion and other active ingredients. It has the characteristics of good elasticity, large elongation, high adhesion, water resistance, acid and alkali resistance, and strong durability. It can be directly painted on the base of wall tile, stone, cement concrete, etc., effectively prevent the base material from leaking water, provide reliable waterproof protection for the kitchen and bathroom space, and do not change the appearance of the base, which is a water-based environmental protection product.
Second, product characteristics
1. Colorless and transparent, after coating does not affect the decorative effect of the original wall or tile, there will be no yellow, dust and other phenomena.
2. Heat resistance, UV resistance, ozone resistance, acid and alkali resistance, wide range of temperature adaptation.
3. It has good film forming property, soft and tough, and can resist the stress caused by deformation and cracking of the base.
4. With water as dispersion medium, non-toxic and harmless, environmental protection and pollution-free.
5. Cold construction, easy operation, can be applied by roller coating, brushing, scraping, spraying and other methods of construction.
6. The film has microporous permeability, which is suitable for hot evaporation in the humid climate in the south, and does not agitate.
7. Less consumption, economic cost.
2. Heat resistance, UV resistance, ozone resistance, acid and alkali resistance, wide range of temperature adaptation.
3. It has good film forming property, soft and tough, and can resist the stress caused by deformation and cracking of the base.
4. With water as dispersion medium, non-toxic and harmless, environmental protection and pollution-free.
5. Cold construction, easy operation, can be applied by roller coating, brushing, scraping, spraying and other methods of construction.
6. The film has microporous permeability, which is suitable for hot evaporation in the humid climate in the south, and does not agitate.
7. Less consumption, economic cost.
3. Product parameters
1. Color: transparent color.
2. Form: liquid.
3. Solid content: 65%.
4. Dry time: 4 hours.
5. Working time: 12 hours (working time will be affected by environmental temperature, humidity and other factors).
6. Water resistance: long-term soaking does not fall off.
7. Shelf life: 12 months.
2. Form: liquid.
3. Solid content: 65%.
4. Dry time: 4 hours.
5. Working time: 12 hours (working time will be affected by environmental temperature, humidity and other factors).
6. Water resistance: long-term soaking does not fall off.
7. Shelf life: 12 months.
4. Scope of application
Suitable for exterior wall, kitchen, bathroom, balcony and other space waterproof treatment, such as:
1. Waterproof and impermeable ceramic tile surface.
2. Waterproof treatment of cement base surface.
3. Waterproof treatment of joints of various materials.
2. Waterproof treatment of cement base surface.
3. Waterproof treatment of joints of various materials.
5. Construction instructions
1. Primary treatment
1. The construction base should be solid, smooth, clean, free of oil, dust and other loose substances.
2. For the parts with cracks and gaps, it is necessary to repair and smooth with appropriate materials (such as waterproof cement).
3. Ensure that the base surface is dry and the moisture content should meet the requirements of the product (the general requirement is that the moisture content is less than [specific value]%). If the base surface is too wet, it can be dried first.
2. Construction steps
1. This product is a single component.
2. Use a brush, roller or spray gun and other tools to evenly paint the waterproof glue on the base surface.
3. First paint the Yin Angle, gap and other parts, and then large-scale painting.
4. It is recommended to paint 3 times, and the direction of each brush should be criss-cross to ensure uniform coating and no omissions.
5. Control the amount of brushing for each pass to avoid being too thick or too thin (usually about 0.5kg per square meter).
3. Construction precautions
1. The construction environment temperature should be between 5℃ and 35℃, avoid construction at too low or too high temperature.
2. Good ventilation conditions should be maintained during construction.
3. Avoid construction in rain, snow or when there is open water on the foundation.
4. After the completion of construction, before the waterproof glue is completely dry (generally more than 12 hours, the specific time depends on environmental conditions), personnel should avoid trampling or other operations that may damage the waterproof layer.
1. The construction base should be solid, smooth, clean, free of oil, dust and other loose substances.
2. For the parts with cracks and gaps, it is necessary to repair and smooth with appropriate materials (such as waterproof cement).
3. Ensure that the base surface is dry and the moisture content should meet the requirements of the product (the general requirement is that the moisture content is less than [specific value]%). If the base surface is too wet, it can be dried first.
2. Construction steps
1. This product is a single component.
2. Use a brush, roller or spray gun and other tools to evenly paint the waterproof glue on the base surface.
3. First paint the Yin Angle, gap and other parts, and then large-scale painting.
4. It is recommended to paint 3 times, and the direction of each brush should be criss-cross to ensure uniform coating and no omissions.
5. Control the amount of brushing for each pass to avoid being too thick or too thin (usually about 0.5kg per square meter).
3. Construction precautions
1. The construction environment temperature should be between 5℃ and 35℃, avoid construction at too low or too high temperature.
2. Good ventilation conditions should be maintained during construction.
3. Avoid construction in rain, snow or when there is open water on the foundation.
4. After the completion of construction, before the waterproof glue is completely dry (generally more than 12 hours, the specific time depends on environmental conditions), personnel should avoid trampling or other operations that may damage the waterproof layer.
6. Packaging and storage
1. Storage conditions: Sealed storage in a cool, ventilated, dry place, away from direct sunlight.
2. Shelf life: In accordance with the storage conditions, shelf life is 12 months.
2. Shelf life: In accordance with the storage conditions, shelf life is 12 months.
Vii. Security Matters
1. Wear appropriate protective equipment during construction, such as gloves, masks, etc.
2. Avoid contact with eyes and skin. In case of contact, rinse immediately with plenty of water and seek medical help.
3. Do not mix the product with other chemicals.
4. Stay away from fire sources and avoid smoking or using open flames on the construction site.
1. Wear appropriate protective equipment during construction, such as gloves, masks, etc.
2. Avoid contact with eyes and skin. In case of contact, rinse immediately with plenty of water and seek medical help.
3. Do not mix the product with other chemicals.
4. Stay away from fire sources and avoid smoking or using open flames on the construction site.
Please read this manual carefully before use, and strictly follow the instructions for construction operations. If in doubt, please consult the relevant professional or manufacturer.