Transparent waterproof adhesive
Transparent waterproof adhesive
Transparent waterproof adhesive
Transparent waterproof adhesive
Transparent waterproof adhesive
Transparent waterproof adhesive
Transparent waterproof adhesive
Transparent waterproof adhesive
Transparent waterproof adhesive
Transparent waterproof adhesive
FOB
Shipping:
Ocean freight
Sample:Free supportGet samples
Product details
Essential details
Shipping:Ocean freight
Product Introduction
Transparent waterproof adhesive product manual
First, product introduction
The transparent waterproof adhesive is a high-grade waterproof material composed of high molecular polymer emulsion and other active ingredients. It has the characteristics of good elasticity, large elongation, strong adhesion, good weather resistance, heat aging, UV resistance, high tensile strength of the film, water resistance, acid and alkali resistance, excellent durability and so on.
Second, product characteristics
1. Non-toxic, tasteless, does not pollute the environment, is a green environmental protection product.
2. Colorless and transparent, it will not destroy the original decorative effect after coating and curing, and can maintain the original color of the building base.
3. Strong resistance, can be bonded with cement, tile, Mosaic, marble and other basic layers, good waterproof effect.
4. Acid and alkali resistance, freeze-thaw resistance, heat resistance, ultraviolet resistance, ozone resistance, pollution resistance.
5. Cold construction, easy operation, can be directly sprayed, will not make tiles, mosaics fade and weathering, extend their service life.
6. Long waterproof life, the external wall waterproof can reach more than 5 years.
7. It has good film formation, permeability after film formation, and is suitable for hot evaporation in the southern humid climate, and does not agitate.
3. Scope of application
1. Repair the leakage and waterproofing of the internal and external walls and cavities of various buildings.
2. Already decorated tile, Mosaic, marble, glass curtain wall and other parts of the waterproof treatment.
3. Waterproof treatment of cracks of concrete base and various metal color steel panels.
Fourth, construction technology
1. Base surface preparation: The surface must be smooth, solid, clean, free of oil, dust and other pine animals. Obvious voids and sand holes should be blocked and smoothed with cement mortar, and sharp edges should be removed. Pre-wet the substrate until there is no water, the newly cast concrete should have a certain dry curing time to prevent the impact of concrete shrinkage, the old concrete surface must be washed with water first, dry and then painted.
2. Construction method: Use a brush or roller to evenly paint the transparent waterproof glue on the wall, the joint of the decorative brick and other parts that need to be waterproof. Generally, brushing 2-3 times can be done, brushing should pay attention to the previous coating dry solid non-stick hands and then paint again, and the direction of brushing should be criss-cross.
5. Precautions
1, the construction temperature should be above 5℃, rainy days or especially humid environment can not be constructed.
2. During construction, it should be ensured that the product completely covers the base surface, and other operations can be carried out after 24 hours of maintenance.
3. If the base surface is too dry, appropriate amount of water should be added to stir well before painting.
4. Each layer of coating must be constructed according to the specified amount, and can not be too much or too little.
5. During the interval or end of construction, clean the construction equipment and work clothes stained with paint with water as soon as possible.
6. Reference dosage
Under normal circumstances, 1kg can be coated 2-4 square meters, the actual amount depends on the specific base situation.
7. Shelf Life
Under normal storage and transportation conditions, the shelf life is 12 months.
Viii. Packaging specifications
Common packaging specifications are 5kg, 10kg, 20kg/barrel.
9. Storage method
Materials should be sealed and stored in a cool and ventilated place, away from direct sunlight.
Please read this manual carefully before using this product, and carry out construction in strict accordance with the requirements of the manual. If in doubt, please consult a professional technician.

Company

Team&Conditions
Work With Us

Collections

Featured Products

All products

About

News
Shop